Property Data
Prices
Rental commission
We are pleased to be able to offer you the space on a commission-free basis.
Information
Available from
by arrangement
Areas
Office space
approx. 1,300.27 m²
Storage area
approx. 11,151.4 m²
Gross floor area (GFA)
approx. 11,151.43 m²
Min. divisible area
approx. 5,399.7 m²
Hall height (approx. in m)
10
Condition and Construction
Year built
2023
Condition
First occupancy
Rooms, Corridors and Floors
Restaurant seats
10
Description
The property is currently being built on a plot of approx. 22.664 m². The standalone property is being constructed in accordance with the BEG-40 standard and features, among other things, fossil-free heating and a PV system. Floor area breakdown: Warehouse space: Unit 1: 5.399,70 m² Unit 2: 5.751,73 m² Technical / common area: Unit 1: 60,60 m² Unit 2: 60,62 m² Mezzanine storage area Unit 1: 151,77 m² Unit 2: 255,52 m² Ground-floor office and staff areas Unit 1: 137,30 m² Unit 2:108,80 m² Mezzanine-level office and staff areas: Unit 1: 539,21 m² Unit 2: 514,97 m²Die Liegenschaft wird derzeit auf einem ca. 22.664 m² großen Grundstück errichtet. Die Solitärliegenschaft wird nach BEG-40-Richtlinie erbaut und verfügt u. a. über eine fossilfreie Heizung, sowie eine PV-Anlage. Flächenaufteilung: Hallenfläche: Unit 1: 5.399,70 m² Unit 2: 5.751,73 m² Technikfläche /Allgemeinfläche: Unit 1: 60,60 m² Unit 2: 60,62 m² Mezzaninfläche Lager Unit 1: 151,77 m² Unit 2: 255,52 m² Büro- und Sozialflächen EG Unit 1: 137,30 m² Unit 2:108,80 m² Büro- und Sozialflächen Mezzanin Ebene: Unit 1: 539,21 m² Unit 2: 514,97 m²
Features
- Completion in Q4/2023 - 24/7 use - 10-metre clear height - 12 loading bays - 2 sectional doors - Heat pump - Heating: air-source heat pump - Floor load capacity: approx. 5 t/m² - Lighting: LED - ESFR sprinkler system- Fertigstellung zu Q4/2023 - 24/7 Nutzung - 10 Meter UKB - 12 Rampentore - 2 Sektionaltore - Wärmepumpe - Heizung: Luft-Wärme-Pumpe - Bodentraglast: ca. 5 t/m² - Beleuchtung: LED - ESFR-Sprinklersystem
Location
The newly built logistics facility is located in Wülfrath’s green business district. The site is also easily accessible for customers and employees by public transport. The site offers excellent motorway connections within a short drive, providing access to Düsseldorf and the neighbouring Ruhr area. From 2025/2026: completion of the missing link and direct connection of the A44 to Ratingen Ost? New travel time to Düsseldorf Airport: 10 minutesDer Logistikneubau befindet sich im grün gelegenen Gewerbestandort von Wülfrath. Auch mit dem ÖPNV ist der Standort bequem für Kunden und Mitarbeiter zu erreichen. Von dem Standort erreichen Sie in kürzester Zeit die sehr gute Autobahnanbindungen, die nach Düsseldorf und ins benachbarte Ruhrgebiet führen. Ab 2025/2026 Lückenschluss und direkte Anbindung der A44 an Ratingen Ost ? neue Fahrtzeit zum Flughafen Düsseldorf: 10 Minuten
42489 Wülfrath
The map is for orientation purposes only and does not represent the exact location. You can obtain the complete address from us.
Energy Certificate
Year built
2023